Notice: Undefined index: HTTP_REFERER in /var/www/vhosts/protean.remarkabledemo.co.uk/httpdocs/index.php on line 425

Kunst Palast Dusseldorf Case Study
A large temporary gallery space that requires a consistent level of finish and reconfiguration on a regular basis. Protean Reform was introduced to provide a solution that replaced the traditional walling construction and provided a system that could be built and rebuilt without compromise to meet an intensive programme of exhibitions and events.
« Back






